Imports at GRAND RAPIDS, MI by Port Of Loading,HS Code Chapter, Consignee Name
About This View
This table shows the top 20 entries based on the current sort criteria. Note that these entries represent approximately 0.0% of the total data. The data is grouped by Port of Loading, HS Code Chapter, and Buyer/Importer. The data encompasses 20 shipments across 20 distinct entries, with a total volume of 4 TEU and 31.0 million KG. The combination of Port of Loading: YANTIAN, HS Code Chapter: 39, Buyer/Importer: DIVERSIFIED DISTRIBUTION SYSTEMS is particularly significant, accounting for 1 TEU (5.0% of the total). The table below provides detailed metrics for each unique combination of these fields, offering insights into patterns and correlations across multiple dimensions.
Use the toolbar below to customize the fields displayed in your summary view.
Active Filters
PortOfLoading | HSCodeChapter | ConsigneeName | Number of Shipments | Total TEU | Total Weight | Earliest Transaction Date | Recent Transaction Date |
---|---|---|---|---|---|---|---|
YANTIAN | 39 | DIVERSIFIED DISTRIBUTION SYSTEMS | 1 | 1 | 6 Tons | Dec 01, 2015 | Dec 01, 2015 |
BRUCE MINE, ONT | 25 | VERPLANKS DOCK | 1 | 0 | 2 KGs | Jul 15, 2023 | Jul 15, 2023 |
MELDRUM BAY, ONT | 25 | VERPLANKS TRUCKING | 1 | 0 | 2 KGs | Oct 20, 2018 | Oct 20, 2018 |
MELDRUM BAY, ONT | 68 | MEEKHOF LAKESIDE GRAND HAVEN | 1 | 0 | 6 Thousand Tons | Jul 24, 2018 | Jul 24, 2018 |
BRUCE MINE, ONT | 68 | REITH RILEY CONSTRUCTION | 1 | 2 | 4 Thousand Tons | Aug 25, 2024 | Aug 25, 2024 |
BRUCE MINE, ONT | 25 | ONTARIO TRAP ROCK | 1 | 0 | 2 KGs | Sep 29, 2023 | Sep 29, 2023 |
BRUCE MINE, ONT | 68 | VERPLANK TRUCKING | 1 | 0 | 1 KGs | May 28, 2025 | May 28, 2025 |
SAULT STE. MARIE, ONT | 31 | LAMAN REITH RILEY CONSTRUCTION | 1 | 0 | 1 KGs | Jul 06, 2017 | Jul 06, 2017 |
MELDRUM BAY, ONT | 25 | LARFARGE NORTH AMERICA | 1 | 0 | 2 KGs | Jul 06, 2022 | Jul 06, 2022 |
BRUCE MINE, ONT | 84 | VERPLANKS TRUCKING | 1 | 0 | 2 KGs | Apr 24, 2023 | Apr 24, 2023 |
GODERICH, ONT | 03 | COMPASS MINERALS | 1 | 0 | 1 KGs | Jun 19, 2017 | Jun 19, 2017 |
MELDRUM BAY, ONT | 25 | MEEKOF GRAND HAVEN | 1 | 0 | 2 KGs | Nov 28, 2022 | Nov 28, 2022 |
BRUCE MINE, ONT | 68 | GREAT LAKES MATERIALS LUDDINGTON | 1 | 0 | 6 Thousand Tons | Jun 28, 2021 | Jun 28, 2021 |
SAULT STE. MARIE, ONT | 26 | RIETH RILEY CONSTRUCTION | 1 | 0 | 4 Thousand Tons | Jan 27, 2016 | Jan 27, 2016 |
39 | DIVERSIFIED DISTRIBUTION SYSTEMS | 1 | 1 | 8 Tons | Apr 29, 2014 | Apr 29, 2014 | |
GODERICH, ONT | 68 | COMPASS MINERALS MANISTEE | 1 | 0 | 1 KGs | Oct 20, 2024 | Oct 20, 2024 |
BRUCE MINE, ONT | 25 | VERPLANKS GRAND HAVEN | 1 | 0 | 2 KGs | Jul 08, 2023 | Jul 08, 2023 |
BRUCE MINE, ONT | 68 | REITH RILEY | 1 | 0 | 4 Thousand Tons | Sep 20, 2023 | Sep 20, 2023 |
MELDRUM BAY, ONT | 20 | REITH RILEY | 1 | 0 | 1 KGs | Jun 10, 2018 | Jun 10, 2018 |
SAULT STE. MARIE, ONT | 03 | RIETH RILEY CONSTRUCTION | 1 | 0 | 5 Thousand Tons | Jun 13, 2014 | Jun 13, 2014 |