DDR ENGINEERING CORP's imports by TEU, Shipper Name, Consignee Name
About This View
This table shows the top 20 entries based on the current sort criteria. Note that these entries represent approximately 0.0% of the total data. The data is grouped by TEU, Seller/Exporter, and Buyer/Importer. The data encompasses 70 shipments across 20 distinct entries, with a total volume of 71 TEU and 306.2 thousand KG. The combination of TEU: Less than or equal to 3 TEU, Seller/Exporter: DONGGUAN ERISSON ACOUSTICS TECHNOLO, Buyer/Importer: DDR ENGINEERING CORP is particularly significant, accounting for 23 shipments (32.9% of the total). The table below provides detailed metrics for each unique combination of these fields, offering insights into patterns and correlations across multiple dimensions.
Use the toolbar below to customize the fields displayed in your summary view.
Active Filters
Recommended Reports
TEU | ShipperName | ConsigneeName | Number of Shipments | Total TEU | Total Weight | Earliest Transaction Date | Recent Transaction Date |
|---|---|---|---|---|---|---|---|
Less than or equal to 3 TEU | DONGGUAN ERISSON ACOUSTICS TECHNOLO | DDR ENGINEERING CORP | 23 | 23 | 89 Tons | May 28, 2015 | Aug 16, 2025 |
Less than or equal to 3 TEU | JIAXING JINLIDA ELECTRON CO LTD | DDR ENGINEERING CORP | 12 | 15 | 126 Tons | Aug 03, 2017 | Aug 07, 2024 |
Less than or equal to 3 TEU | HANSEN ELECTRONICS CO LTD | DDR ENGINEERING CORP | 4 | 4 | 10 Tons | May 04, 2023 | May 22, 2025 |
Less than or equal to 3 TEU | SHENGZHOU HUADA ELECTRONIC CO LTD | DDR ENGINEERING CORP | 4 | 4 | 3 Tons | Jul 03, 2022 | Jul 09, 2025 |
Less than or equal to 3 TEU | CHENGZHOU HAIHANG IMPEXP CO LTD | DDR ENGINEERING CORP | 3 | 3 | 14 Tons | Aug 13, 2024 | Sep 28, 2025 |
Less than or equal to 3 TEU | NINGBO DATOR ELECTRONIC CO LTD | DDR ENGINEERING CORP | 3 | 3 | 3 Tons | May 20, 2022 | Jan 11, 2024 |
Less than or equal to 3 TEU | NINGBO XIANGYANG ECONOMIC AND TRADE | DDR ENGINEERING CORP | 3 | 3 | 6 Tons | May 15, 2023 | Aug 05, 2025 |
Less than or equal to 3 TEU | JIANGMEN LANGJIE TRADE CO LTD | DDR ENGINEERING CORP | 2 | 2 | 2 Tons | Jul 01, 2015 | May 31, 2017 |
Bulk or LCL | TONG WO INDUSTRIAL LTD | DDR ENGINEERING CORP | 2 | 0 | 10 Tons | Feb 12, 2012 | Jun 11, 2012 |
Less than or equal to 3 TEU | DONGGUAN IETOP AUDIO CO LTD | DDR ENGINEERING CORP | 2 | 2 | 845 KGs | Sep 01, 2022 | Sep 09, 2025 |
Less than or equal to 3 TEU | DONGGUAN ERISSON ACOUSTICS TECHNOLO QIAOYUAN | DDR ENGINEERING CORP | 2 | 2 | 5 Tons | Jul 27, 2023 | Jul 27, 2023 |
Less than or equal to 3 TEU | NINGBO TONWEL AUDIO EQUIPMENTS CO | DDR ENGINEERING CORP | 2 | 2 | 1 Tons | Oct 23, 2021 | Oct 23, 2021 |
Less than or equal to 3 TEU | HUANGSHAN JIANGYUAN HIGH TECH MAGNE | DDR ENGINEERING CORP | 1 | 1 | 4 Tons | May 15, 2023 | May 15, 2023 |
Less than or equal to 3 TEU | FOSHAN KDA IMPORT & EXPORT CO LT | DDR ENGINEERING CORP | 1 | 1 | 2 Tons | Dec 20, 2022 | Dec 20, 2022 |
Less than or equal to 3 TEU | DONGGUAN HODE INTELLIGENT EQUIPMENT CO LTD | DDR ENGINEERING CORP | 1 | 1 | 590 KGs | Nov 08, 2024 | Nov 08, 2024 |
Less than or equal to 3 TEU | GRAND GROUP | DDR ENGINEERING CORP | 1 | 1 | 800 KGs | Oct 21, 2012 | Oct 21, 2012 |
Less than or equal to 3 TEU | ZHEJIANG WONDER SUPPLY CHAIN MANAGE | DDR ENGINEERING CORP | 1 | 1 | 3 Tons | Oct 08, 2022 | Oct 08, 2022 |
Less than or equal to 3 TEU | NINGBO RIXING ELECTRONICS CO LTD | DDR ENGINEERING CORP | 1 | 1 | 6 Tons | Jul 08, 2012 | Jul 08, 2012 |
Less than or equal to 3 TEU | GUANGZHOU GUDIAN INTERNATIONAL TRADE | DDR ENGINEERING CORP | 1 | 1 | 11 Tons | Jan 07, 2025 | Jan 07, 2025 |
Less than or equal to 3 TEU | GUANGZHOU ADS AUDIO SCIENCE TECHNOL ADS INDUSTRIAL ZONE SHIMA JUNHE | DDR ENGINEERING CORP | 1 | 1 | 2 Tons | Apr 26, 2019 | Apr 26, 2019 |